The way into the room. A play in three acts. As overture - Ambience & Architecture.
Then the highlight with trendy, well thought-out interiors. Finally - technology.
State-of-the-art of course. Simply let it take effect.
- Unique modular system with 11m² modules. Extendable at any time, exchangeable, changeable
- Starting at 22m² incl. bathroom, toilet, kitchen, living and sleeping area
- Ecologically high standard building materials of the latest generation and precision work
- Interior in various designs as well as additional fittings and details such as home computer, extra lighting, interiors etc.
- Integrated house technique such as electric and sanitary installation and heating system as well as air conditioning
- Economical energy consumption via air–heat pump
- Variations of the exterior through various colours and material
- Various additional modules such as entrance, terrace, carport
- Small building plots from 200m², new resources from leased plots, settlement of high rise buildings
- Assembly and disassembly within a few days
- Removal and transport with a standard haulage truck within a few days
- Simple foundation solutions, as the structural installation is already integrated
- Assembly time 2-3 days ready for occupancy according to size
- Made in Austria
- Unique modular system with 11m² modules. Extendable at any time, exchangeable, changeable
- Starting at 22m² incl. bathroom, toilet, kitchen, living and sleeping area
- Ecologically high standard building materials of the latest generation and precision work
- Interior in various designs as well as additional fittings and details such as home computer, extra lighting, interiors etc.
- Integrated house technique such as electric and sanitary installation and heating system as well as air conditioning
- Economical energy consumption via air–heat pump
- Variations of the exterior through various colours and material
- Various additional modules such as entrance, terrace, carport
- Small building plots from 200m², new resources from leased plots, settlement of high rise buildings
- Assembly and disassembly within a few days
- Removal and transport with a standard haulage truck within a few days
- Simple foundation solutions, as the structural installation is already integrated
- Assembly time 2-3 days ready for occupancy according to size
- Made in Austria

